为探讨沥青砼桥面铺装的施工工艺,首先分析了车辆荷载分布及大小与设计荷载不符、外界环境的影响以及施工技术不达标这3种桥面铺装的常见破坏原因,然后从对沥青砼材料的控制要求、对沥青砼施工温度和施工时间的控制要求、对沥青砼施工过程的控制要求等方面入手探讨了如何从控制铺装层的施工要求入手来确保铺装层的质量,最后总结了沥青砼桥梁铺装的技术改善措施。
In order to explore the construction technology of asphalt concrete pavement, the common failure causes of the three types of bridge deck pavement, including the distribution of vehicle load, the discrepancy of size and design load, the influence of external environment and the failure of construction technology, were analyzed. Concrete material control requirements, asphalt concrete construction temperature and construction time control requirements, the asphalt concrete construction process control requirements and other aspects of how to start from the control of the construction requirements of pavement to ensure the quality of the pavement, and finally Summarized the technical improvement measures of asphalt concrete pavement.