论文部分内容阅读
中国土木工程学会、中国公路学会、中国建筑学会于1981年6月25日至29日在山东济南召开了斜拉桥学术讨论会。参加会议的共有86个单位的代表124人。会议期间有15位同志在大会上作了有关斜拉桥设计、施工、试验等方面的学术报告。大会后又分桥型方案、结构设计计算、施工及斜索构造、索力及主梁标高控制调整和风振及风洞试验五个小组进行专题讨论。会议开得生动活跃,广泛地交流了我国在最近几年中修建斜拉桥这种新桥型的经验。我
China Civil Engineering Society, China Highway Society, China Institute of Architecture in June 1981 from June 29 to 29 held in Jinan, Shandong Cable-stayed Bridge Symposium. A total of 124 representatives of 86 participating units attended the meeting. During the meeting, 15 comrades made academic reports on the design, construction and test of cable-stayed bridges at the conference. After the conference, the five sub-groups of bridge type scheme, structural design and calculation, construction and inclined cable structure, cable force and adjustment of main girder elevation control and wind vibration and wind tunnel test were held. The meeting opened vividly and extensively exchanged experiences of constructing this new bridge type of cable-stayed bridge in our country in recent years. I