论文部分内容阅读
水电是水利经济中极具活力的部分,挖掘水能潜力,开发水电,提高原有工程的利用效率,已成为我省发展水利经济的一条重要途径.石头河管理局石头河管理局八十年代末水库工程基本建成后,确立了“举债经营、靠水起家、靠电发展”的工作思路.贷款800多万元,自筹300余万元,建成了装机16500千瓦的坝后电站,发挥了自身水能的优势,奠定了全局经济发展的基础,壮大了全局经济实力.相继又利用坝后电站尾水,建成了装机96O千瓦的斜峪关电站,利用石头河向西安供水工程建成了装机3000千瓦的汤峪电站.在建的有装机960千瓦的万家源电站;同时还利用经济实力和较高的管理技术,结合“引红济石”工程建设及石头河流域太白、眉县等县的电气化县建设,大力发展水电.还准备兼并当地政府在石头河灌区修建的三座因管理不善而导致效益较差的电站.充裕的电能也为石头河管理局的发展奠定了能源基础.立足于电能升值和综合经营,建成了西北地区最大的电解猛厂,产品全部用于出口;已与有关方面达成了合作意向,建设年产10万吨高标号水泥厂及建设斜峪关工业园区.石头河管理局真正走出了一条以水兴电,以电兴工,以电促水的产业化水利发展新路子.总资产由2亿
Hydropower is a very dynamic part of the water conservancy economy. It is an important way to develop water conservancy economy in our province to excavate the potential of hydropower, develop hydropower and improve the utilization efficiency of the original project. At the end of the reservoir project basically completed, established a “debt management, rely on the water started by electricity development” work train of thought.Look more than 8000000 yuan, raised more than 3000000 yuan, built 16500 kilowatts dam installed power station, played its own water Can have the advantage, laid the foundation for the overall economic development, and strengthen the overall economic strength.Afterward, the tail water of the post-dam power station has been used to build an installed capacity of 96O kilowatts of the Beiyuguan Power Station, and the use of stone river to the Xi’an water supply project has completed an installed capacity of 3,000 kilowatts Tangyu hydropower station under construction has installed 960 kilowatts of Wanjiayuan power station at the same time also use the economic strength and higher management techniques, combined with “red lead Jiashi” project construction and the Taibai, Mei County and other counties Electrification County, vigorously develop hydropower.Also prepared to merge the local government in Shitouhe Irrigation District, three due to poor management led to poor efficiency of the power station.Ample power for the stone river Based on the appreciation of electricity and integrated management, the largest electrolytic fierce factory in Northwest China was established and all the products were exported. We have reached a cooperation intention with relevant parties to build an annual output of 100,000 tons of high grade Cement plant and construction of the Industrial Park in the valley. Shitouhe Administration really out of a water power, to power industry, electricity and water to promote industrial water conservancy development of new roads by the total assets of 200 million