创新一招节约成本34万元VE在洗煤厂筒仑壁改进中的应用中煤建安公司第七工程处张桂华中煤建安七处在内蒙古准格尔露天煤矿施工的922m毛煤筒仓工程中,应用价值工程原理,对9个筒仓从滑模机具组装的改进到抽芯滑模工艺的创新等全过程进行了一次性的价值分析。以小...
Innovate a move to save cost of 340,000 yuan VE in the coal wall improvement of the plant in the coal wall plant in the construction of the company’s No. 7 Agency Zhang Guihua China Coal Jianan 7 in Inner Mongolia Zhungeer open pit coal mine construction of 922m coal Based on the principles of applied value engineering, a one-time value analysis was conducted on the entire process from the improvement of the assembly of slide molds to the innovation of the core sliding mode process. With small...