由水电部杭州机械设计研究所研究设计,水电部第三工程局制造、安装以及两单位共同调试的8×15冰楼,已于1988年6月20日在安康水电工程正式投入使用,至今运行正常,有效地解决了安康工程混凝土预冷问题,保证了夏季混凝土生产的顺利进行。8×15冰楼是1982年12月24日~27日由水电部机械制造局和水电部水电总局主持召开的《龙羊峡、安
The 8 × 15 ice building, which was researched and designed by the Hangzhou Mechanical Design Institute of the Ministry of Electric Power and Power, the third engineering bureau of the Ministry of Electric Power and the 8 × 15 ice building jointly commissioned by the two units, was officially put into operation at the well-being hydropower project on June 20, 1988 and has operated Normal and effective solution to the well-being of concrete pre-cooling project to ensure the smooth progress of concrete production in summer. 8 × 15 Ice House was December 24, 1982 to 27 by the Ministry of MEP and the Ministry of Water Resources and Hydropower Administration hosted the "Longyangxia, Ann