论文部分内容阅读
本文对永平铜矿10号坝注浆帷幕结构进行了分析,为设计提供了最优参数,经工程实践考验,说明这种分析是符合实际的。
This paper analyzes the grouting curtain structure of 10 # dam of Yongping Copper Mine, and provides the optimal parameters for the design. The engineering practice test shows that this analysis is in line with the actual situation.