论文部分内容阅读
After water is impounded in a reservoir,rock mass in the hydro-fluctuation belt of the reservoir bank slope is subject to water saturationdehydration circulation(WSDC). To quantify the rate of change of rock mechanical properties, samples from the Longtan dam area were measured with uniaxial compression tests after different numbers(1,5, 10, 15, and 20) of simulated WSDC cycles. Based on the curves derived from these tests, a modified HoekBrown failure criterion was proposed, in which a new parameter was introduced to model the cumulative damage to rocks after WSDC. A case of an engineering application was analyzed, and the results showed that the modified Hoek-Brown failure criterion is useful.Under similar WSDC-influenced engineering and geological conditions, rock mass strength parameters required for analysis and evaluation of rock slope stability can be estimated according to this modified Hoek-Brown failure criterion.
After quantified the rate of change of rock mechanical properties, samples from the Longtan dam area were subject to the hydro-fluctuation belt of the reservoir bank slope is subject to water saturation (WSDC) Based on the curves derived from these tests, a modified Hoek Brown failure criterion was proposed, in which a new parameter was introduced to model the cumulative damage to rocks after WSDC. A case of an engineering application was analyzed, and the results showed that the modified Hoek-Brown failure criterion is useful. Under similar WSDC-influenced engineering and geological conditions, rock mass strength parameters required for analysis and evaluation of rock slope stability can be estimated according to this modified Hoek-Brown failure criterion.