1 工程概况梅潭水电站位于广东省大埔县境内梅潭河中下游,上距县城湖寮镇4km,距在建的龙头水电站——双溪水电站27km。下距三河坝水电站14km,是梅潭河梯级开发的第7级电站。该电站开发目标以发电为主,兼有供水、旅游等其他综合利用。该电站是大埔县近年来进行基础设施建设的又一重点工程,电站由中南勘测设计院设计,广东省水电二局施工,珠委设计院监理。梅潭水电站正常蓄水位63.50m,相应库容542万m~3,设计洪水位62.90m,校核洪水位66.62
1 Project Overview Meitan Hydropower Station is located in Dapu County, Guangdong Province, the middle and lower reaches of Meitan River, from the county town of Lao Liu 4km, from the construction of the faucet - Shuangxi Hydropower Station 27km. It is 14 km away from Sanheba Hydropower Station and is the 7th power plant developed by the cascade of Meitan River. The power plant development goal to generate electricity, both water supply, tourism and other comprehensive utilization. The power station is another major project of infrastructure construction in recent years in Dapu County. The power station is designed by Zhongnan Investigation and Design Institute, constructed by Guangdong Provincial Hydropower Bureau and supervised by Design Institute of Zhuhai Committee. Meitan hydropower station normal water level 63.50m, the corresponding capacity of 5420000 m ~ 3, the design flood 62.90m, check flood 66.62