太平驿水电站总装机26万kW,长大引水系统,技术复杂,施工难度很大。工程建设于1991年7月开工,第一台机组于1994年1月比计划工期提前6个月发电。在建设中坚持改革,注重整体效益;坚持合同管理,发承包方尊重客观事实、风险共担,维护合同的严肃性;坚持设计优化;创造良好的外部条件,在保证工程质量、保证合理工期的同时,较好地控制了动态投资,工程效益显著。
Taipingyi hydropower station total installed capacity of 260,000 kW, the growth of water diversion system, technical complexity, construction is very difficult. Construction started in July 1991, the first unit in January 1994 than the planned duration of 6 months ahead of schedule. Adhere to the reform in the construction, focus on overall efficiency; adhere to the contract management, the contractor respect the objective facts, risk sharing, the seriousness of maintaining the contract; adhere to the design optimization; create good external conditions, to ensure project quality and ensure a reasonable duration At the same time, better control of the dynamic investment, significant engineering benefits.