论文部分内容阅读
本文结合大(同)西(安)客运专线箱梁架设施工实践,就高铁和客专箱梁架设施工关键工序的技术控制进行了简要阐述。
In this paper, based on the practice of the erection of box girder for the passenger railway line in the Great (same) Xi (An) Passenger Dedicated Line, the technical control of the key processes of the erection and construction of the high-speed railway and passenger dedicated box girder is briefly described.