摘要: 我国的建筑业正以惊人的速度朝着世界先进的管理水平发展。以工程项目管理为核心的企业生产运营管理机制已基本形成,项目经理责任制和项目成本核算制已成为建筑业企业普遍实行的有效项目管理机制。从“项目法施工”的诞生到“工程项目管理体系”的健全、推广,改进施工方法、有效的成本控制、合理的配置资源、追求项目利润的最大化已成为建筑企业生存发展的必由之路。
关键词:工程;项目管理;弊端;设计
Abstract: the construction industry in China is developing at a breathtaking speed towards the world advanced management level development. With project management as the core enterprise operations management mechanism has basically formed, the project manager responsibility system and project cost HeSuanZhi has become a construction enterprise applies the effective project management mechanism. From "project construction method" the birth of "engineering project management system" sound, promotion, improve the construction methods and effective cost control, reasonable distribution of resources, the pursuit of project the maximization of profit has become the only way of building enterprise's survival and development.
Keywords: engineering; Project management; Disadvantages; design
中图分类号:S611文献标识码:A 文章编号:
所谓工程项目管理,就是为了使工程项目在一定的约束条件下取得成功,对项目的所有活动实施决策与计划、组织与指挥、控制与协调等一系列工作的总称。其基本内涵是以建设工程项目为对象,以项目经理责任制为核心,以施工图预算中标价为依据,以创优质工程为目标, 1984年在国内首先采用国际招标,实行项目管理,缩短了工期,降低了造价,取得了明显的经济效益。近年来,一些比较先进的建筑工程公司,为了适应项目建设大型化、一体化以及项目大规模融资和分散项目风险的需要,推出了一些成熟的项目管理模式,研究这些管理模式对于探索符合我国基本建设客观规律的管理体制,有效地实施建设项目的进度、费用和质量,获得最佳的投资效益具有一定的现实意义。但也毋需讳言的是,在我国的工程管理体制中还存在不少弊端,有些工程项目管理在许多方面都已不适应现实的需要。
一、 当前我国工程项目管理的弊端
1、投资管理体制出现诸多弊端,制约咨询业发展。我国工程建设领域的投资主要来源于国家、地方政府和公有制企事业单位,各级政府在项目建设中起着决定性的作用。为体现项目的重要性,保证项目实施的顺利进行,项目法人的领导班子大多由各级行政领导和主管部门负责人组成,项目法人责任制实质上还是“厂长、经理负责制”加“工程指挥部制”,投资体制仍带有浓厚的行政色彩和极强的计划性。这种体制导致工程咨询业显得多余,也易出现“高投资、低效益,高积累、低发展”的现象。
2、机构臃肿,层次重叠,管理人员比例失调,影响管理效能和工作效率。本来监理单位能够负责工程的全面监督与管理,而项目法人下面又设立项目经理管理班子,这不仅导致了机构膨胀,而且增加了一笔不少的建设单位管理费,背离了降低成本的要求。此外,在《关于实行建设项目法人责任制的暂行规定》中,由项目法人聘任的建设项目经理具有从初步设计到项目后评价的管理职权,并负责组织工程建设实施和控制工程投资、工期与质量,这与监理方的权限产生了很大的重复。这些都严重影响了工程管理效能和工作效率。
3、职工队伍结构失衡,素质不高,难以适应建筑业发展的需要。目前我国现有的设计单位多为综合性设计单位,包含着建筑、结构、机电等多专业工种,大都组织庞大,少则上百人,多则上千人,这些设计单位远远不能适应目前国际流行的以设计为龙头的总承包体制。小而专、大而强的承包单位和项目管理公司不多。由于管理模式、水平的差距,使得国内工程项目管理市场拱手让给国外公司,如鲁布革水电站、小浪底水电站、大亚湾水电站、深圳地王大厦以及北京、上海、广州等地的许多大型项目的项目管理基本上是被欧美国家的项目管理公司或项目咨询公司所包揽。
4、有法不依,无法可依。建筑市场不规范现象令人堪忧,一些建设主体受经济利益的驱使,处处钻空子,严重损害了消费者的利益。一个总投资23亿的重要铁路项目——宇松工程,竟被层层转包、违规分包给一家“冒牌”公司和几个“完全不懂建桥”的包工头;本应浇筑混凝土的桥墩,竟在工程监理的眼皮底下,被偷工减料投入大量石块,形成巨大的安全隐患。此外,有关工程项目管理的法规不健全,导致有些项目无法可依,只能靠政府特批,易出现腐败。
二、 工程项目管理模式的使用
为了适应现代工程项目管理的特点和要求,现代工程项目管理模式必须创新,必须从系统工程的要求、 高知识和高技能的要求、专业化和社会化的要求等来选择工程项目管理的模式。
1、设计 — 招标 — 建造模式, (Design/ Bid/ Build简记DBB模式)这是一种传统模式。采用这种方法时,业主与设计机构(建筑师/工程师)签订专业服务合同,建筑师/工程师负责提供项目设计和施工文件。如为业主准备合同文件,协助业主进行竞争性招标。在业主与承包商之间建立一种内在的对立关系。在设计机构的协助下,通过竞争性招标将工程施工任务交给报价和质量都满足要求且最具资质的投标人(总承包商)来完成。在施工阶段,设计专业人员通常担任重要的监督角色,起着业主代理人的作用,在业主与承包商之间建立沟通的桥梁。由于业主选择建筑师/工程师都是他了解和信赖的,其地位相当于业主的咨询师和受托人,所以业主与建筑师/工程师之间比较容易合作。建筑师/工程师与承包商之间是工作关系,且承包商必须经常接受并服从建筑师/工程师发布的指令,因此,两者之间存在着潜在的对立关系。
2、设计 — 建造 — 交钥匙模式。这种模式要求业主只需选定唯一的实体负责项目的设计与施工。一般来说,该实体可以是大型承包商,具备项目管理能力的设计咨询公司,或者是专门从事项目管理的公司。承包商应按照雇主的要求,负责工程的设计与实施,包括土木、机械、电气等综合工程以及建筑工程。这类“交钥匙”合同通常包括设计、施工、装置、装修和设备,承包商应向雇主提供一套配备完整的设施,且在转交“钥匙”时即可投入运行。这种模式主要有两个特点:(1)具有高效率性。(2)责任的单一性。这种模式解决了机构臃肿、层次重叠、管理人员比例失调的现象。
3、BOT模式。BOT(Build-Operate-Transfer)即建造 — 运营移交模式。这种模式是80年代国外兴起的一种依靠私人资本进行基础设施建设的一种融资和建造的项目管理模式,或者说是基础设施国有项目民营化。
利用BOT投资方式发展基础设施的优点有:有利于引导外资向基础产业合理倾斜,使之真正取得一種规模经济效益;有利于在投资建设和运营管理中引进先进的技术和管理方法;有利于改善利用外资的结构;有利于提高基础设施项目的建设效率;有利于解决目前面临的基础设施不足与建设资金短缺的矛盾;有利于在不影响政府所有权的前提下,分散基础设施投资风险;有利于帮助基础设施使用者树立有偿使用的新观念 ,实现基础设施建设的良性循环。
当前我国推行BOT投资方式的优势是政府信用等级较好。当项目东道国政府愿意为项目的某些风险提供担保时,贷款银行就会关心该国的信用等级和社会形势是否稳定,拥有较高信用等级的国家,其发展BOT 项目的机会就多,成功率就大。由于我国经济发展很快,增长速度居世界第一,信守合同,因此国际资信评级还是很高的。
以上三种工程项目管理模式,各有千秋。当前使用传统的设计 — 招标 — 建造模,更适合我国转型时期的特点。但有条件的使用设计 — 建造 — 交钥匙模式,政府有关部门应大力扶持,并为这种模式的推广提供政策支持。BOT模式虽然我国在目前无法全面实施,但为了更好地迎接WTO的挑战,我们必须尽快做好有关法规的配套工作,为有实力的工程公司增强国际竞争力保驾护航。
结束语;
综上所述:所谓的项目管理并非直观理念上的对项目进行管理,随着现代管理理论的不断发展,项目管理不仅仅是一种管理方法,它还是一门学科体系。而对于大型工程来说,其具有工期长、投资大等显著特点,因此对大型工程项目的管理要求更趋于系统化和科学化。
注:文章内所有公式及图表请用PDF形式查看。
关键词:工程;项目管理;弊端;设计
Abstract: the construction industry in China is developing at a breathtaking speed towards the world advanced management level development. With project management as the core enterprise operations management mechanism has basically formed, the project manager responsibility system and project cost HeSuanZhi has become a construction enterprise applies the effective project management mechanism. From "project construction method" the birth of "engineering project management system" sound, promotion, improve the construction methods and effective cost control, reasonable distribution of resources, the pursuit of project the maximization of profit has become the only way of building enterprise's survival and development.
Keywords: engineering; Project management; Disadvantages; design
中图分类号:S611文献标识码:A 文章编号:
所谓工程项目管理,就是为了使工程项目在一定的约束条件下取得成功,对项目的所有活动实施决策与计划、组织与指挥、控制与协调等一系列工作的总称。其基本内涵是以建设工程项目为对象,以项目经理责任制为核心,以施工图预算中标价为依据,以创优质工程为目标, 1984年在国内首先采用国际招标,实行项目管理,缩短了工期,降低了造价,取得了明显的经济效益。近年来,一些比较先进的建筑工程公司,为了适应项目建设大型化、一体化以及项目大规模融资和分散项目风险的需要,推出了一些成熟的项目管理模式,研究这些管理模式对于探索符合我国基本建设客观规律的管理体制,有效地实施建设项目的进度、费用和质量,获得最佳的投资效益具有一定的现实意义。但也毋需讳言的是,在我国的工程管理体制中还存在不少弊端,有些工程项目管理在许多方面都已不适应现实的需要。
一、 当前我国工程项目管理的弊端
1、投资管理体制出现诸多弊端,制约咨询业发展。我国工程建设领域的投资主要来源于国家、地方政府和公有制企事业单位,各级政府在项目建设中起着决定性的作用。为体现项目的重要性,保证项目实施的顺利进行,项目法人的领导班子大多由各级行政领导和主管部门负责人组成,项目法人责任制实质上还是“厂长、经理负责制”加“工程指挥部制”,投资体制仍带有浓厚的行政色彩和极强的计划性。这种体制导致工程咨询业显得多余,也易出现“高投资、低效益,高积累、低发展”的现象。
2、机构臃肿,层次重叠,管理人员比例失调,影响管理效能和工作效率。本来监理单位能够负责工程的全面监督与管理,而项目法人下面又设立项目经理管理班子,这不仅导致了机构膨胀,而且增加了一笔不少的建设单位管理费,背离了降低成本的要求。此外,在《关于实行建设项目法人责任制的暂行规定》中,由项目法人聘任的建设项目经理具有从初步设计到项目后评价的管理职权,并负责组织工程建设实施和控制工程投资、工期与质量,这与监理方的权限产生了很大的重复。这些都严重影响了工程管理效能和工作效率。
3、职工队伍结构失衡,素质不高,难以适应建筑业发展的需要。目前我国现有的设计单位多为综合性设计单位,包含着建筑、结构、机电等多专业工种,大都组织庞大,少则上百人,多则上千人,这些设计单位远远不能适应目前国际流行的以设计为龙头的总承包体制。小而专、大而强的承包单位和项目管理公司不多。由于管理模式、水平的差距,使得国内工程项目管理市场拱手让给国外公司,如鲁布革水电站、小浪底水电站、大亚湾水电站、深圳地王大厦以及北京、上海、广州等地的许多大型项目的项目管理基本上是被欧美国家的项目管理公司或项目咨询公司所包揽。
4、有法不依,无法可依。建筑市场不规范现象令人堪忧,一些建设主体受经济利益的驱使,处处钻空子,严重损害了消费者的利益。一个总投资23亿的重要铁路项目——宇松工程,竟被层层转包、违规分包给一家“冒牌”公司和几个“完全不懂建桥”的包工头;本应浇筑混凝土的桥墩,竟在工程监理的眼皮底下,被偷工减料投入大量石块,形成巨大的安全隐患。此外,有关工程项目管理的法规不健全,导致有些项目无法可依,只能靠政府特批,易出现腐败。
二、 工程项目管理模式的使用
为了适应现代工程项目管理的特点和要求,现代工程项目管理模式必须创新,必须从系统工程的要求、 高知识和高技能的要求、专业化和社会化的要求等来选择工程项目管理的模式。
1、设计 — 招标 — 建造模式, (Design/ Bid/ Build简记DBB模式)这是一种传统模式。采用这种方法时,业主与设计机构(建筑师/工程师)签订专业服务合同,建筑师/工程师负责提供项目设计和施工文件。如为业主准备合同文件,协助业主进行竞争性招标。在业主与承包商之间建立一种内在的对立关系。在设计机构的协助下,通过竞争性招标将工程施工任务交给报价和质量都满足要求且最具资质的投标人(总承包商)来完成。在施工阶段,设计专业人员通常担任重要的监督角色,起着业主代理人的作用,在业主与承包商之间建立沟通的桥梁。由于业主选择建筑师/工程师都是他了解和信赖的,其地位相当于业主的咨询师和受托人,所以业主与建筑师/工程师之间比较容易合作。建筑师/工程师与承包商之间是工作关系,且承包商必须经常接受并服从建筑师/工程师发布的指令,因此,两者之间存在着潜在的对立关系。
2、设计 — 建造 — 交钥匙模式。这种模式要求业主只需选定唯一的实体负责项目的设计与施工。一般来说,该实体可以是大型承包商,具备项目管理能力的设计咨询公司,或者是专门从事项目管理的公司。承包商应按照雇主的要求,负责工程的设计与实施,包括土木、机械、电气等综合工程以及建筑工程。这类“交钥匙”合同通常包括设计、施工、装置、装修和设备,承包商应向雇主提供一套配备完整的设施,且在转交“钥匙”时即可投入运行。这种模式主要有两个特点:(1)具有高效率性。(2)责任的单一性。这种模式解决了机构臃肿、层次重叠、管理人员比例失调的现象。
3、BOT模式。BOT(Build-Operate-Transfer)即建造 — 运营移交模式。这种模式是80年代国外兴起的一种依靠私人资本进行基础设施建设的一种融资和建造的项目管理模式,或者说是基础设施国有项目民营化。
利用BOT投资方式发展基础设施的优点有:有利于引导外资向基础产业合理倾斜,使之真正取得一種规模经济效益;有利于在投资建设和运营管理中引进先进的技术和管理方法;有利于改善利用外资的结构;有利于提高基础设施项目的建设效率;有利于解决目前面临的基础设施不足与建设资金短缺的矛盾;有利于在不影响政府所有权的前提下,分散基础设施投资风险;有利于帮助基础设施使用者树立有偿使用的新观念 ,实现基础设施建设的良性循环。
当前我国推行BOT投资方式的优势是政府信用等级较好。当项目东道国政府愿意为项目的某些风险提供担保时,贷款银行就会关心该国的信用等级和社会形势是否稳定,拥有较高信用等级的国家,其发展BOT 项目的机会就多,成功率就大。由于我国经济发展很快,增长速度居世界第一,信守合同,因此国际资信评级还是很高的。
以上三种工程项目管理模式,各有千秋。当前使用传统的设计 — 招标 — 建造模,更适合我国转型时期的特点。但有条件的使用设计 — 建造 — 交钥匙模式,政府有关部门应大力扶持,并为这种模式的推广提供政策支持。BOT模式虽然我国在目前无法全面实施,但为了更好地迎接WTO的挑战,我们必须尽快做好有关法规的配套工作,为有实力的工程公司增强国际竞争力保驾护航。
结束语;
综上所述:所谓的项目管理并非直观理念上的对项目进行管理,随着现代管理理论的不断发展,项目管理不仅仅是一种管理方法,它还是一门学科体系。而对于大型工程来说,其具有工期长、投资大等显著特点,因此对大型工程项目的管理要求更趋于系统化和科学化。