论文部分内容阅读
研究水口电站在枯水年份兼顾发电与航运条件下的经济效益优化空间,结果表明实际存在1.48亿kWh优化电量前提下,实现机组负荷优化分配还将提高电站1.69%的经济效益响。
The optimization of economic benefits of Shuikou Hydropower Station under the conditions of power generation and shipping in the dry year was studied. The results show that under the precondition of optimizing power consumption of 148 million kWh, optimizing the unit load will improve the economic benefit of the power plant by 1.69%.