论文部分内容阅读
The Ministry of Railways is carrying out on detailed inspections 1._______
and maintenance along China’s Qinghai-Tibet Railway ensure 2._______
that the trains run safe across the world’s highest land during 3._______
the winter, says ministry spokesman, Wang Yongping.4._______
About 550 kilometers of track run over the unstable icy land 5._______
which is likely to rising. Temperatures high up on the Qinhai 6._______
land must drop to minus 45 degrees in the winter.7._______
The Qinghai-Tibet Railway stretches 1,956 kilometers from the 8._______
Xining, capital of northwest China’s Qinghai Province, to Lhasa,
capital of Tibet Autonomous Region. About 960 kilometers of 9._______
the track is 4,000 meters over the sea level, with the highest point 10._____
at 5,072 meters.
参考答案:
1. on (去掉on)2. ensure前加 to3. safe àsafely4. say à said5. run à runs
6. rising à rise7. must à can8. the (去掉the)9. √10. over à above
and maintenance along China’s Qinghai-Tibet Railway ensure 2._______
that the trains run safe across the world’s highest land during 3._______
the winter, says ministry spokesman, Wang Yongping.4._______
About 550 kilometers of track run over the unstable icy land 5._______
which is likely to rising. Temperatures high up on the Qinhai 6._______
land must drop to minus 45 degrees in the winter.7._______
The Qinghai-Tibet Railway stretches 1,956 kilometers from the 8._______
Xining, capital of northwest China’s Qinghai Province, to Lhasa,
capital of Tibet Autonomous Region. About 960 kilometers of 9._______
the track is 4,000 meters over the sea level, with the highest point 10._____
at 5,072 meters.
参考答案:
1. on (去掉on)2. ensure前加 to3. safe àsafely4. say à said5. run à runs
6. rising à rise7. must à can8. the (去掉the)9. √10. over à above