钢轨18号道岔国产化研究”通过部鉴定“时速250公里客运专线60公斤/米钢轨18号道岔国产化研究”日前通过铁道部科技司科技成果鉴定。该项目主持单位为铁道部工管中心,铁建所为主要参加单位。在充分消化吸收国外高速道岔先进技术的基础上,立足国产化,开展了客运专线道岔及其部件
Ministry of Railways Ministry of Science and Technology Division of Science and Technology Achievements identified by the Ministry of Railways Ministry of Science and Technology Scientific and Technological Achievements identified the project host unit for the Ministry of Railways Pipe Work Center, Railway Construction Institute as the main participating units in the full digestion and absorption of foreign advanced technology of high-speed turnout on the basis of localization, carried out passenger dedicated turnout and its components