论文部分内容阅读
水电站泄洪雾化区及以上自然边坡陡峭,未进行系统开挖,为解决施工道路布置与材料运输困难条件下的运输问题,本文介绍了锦屏一级水电站泄洪雾化区及以上高位危岩体施工中交通运输难题的处理方案,以期为类似工程提供借鉴。
In order to solve the transportation problem under the conditions of construction road layout and material transportation difficulties, this paper introduces the flood discharge atomization zone of Jinping first stage hydropower station and above high dangerous rock Body construction transport solutions to deal with the problem, with a view to provide reference for similar projects.