论文部分内容阅读
本文介绍大型深水铺管船浮吊辅钩的基本情况,载荷试验前的主要工作准备;通过借鉴国外类似工程的常用做法,着重论述了吊重试验过程中详细的关键步骤及试验后重点检验点分析,可推荐为类似浮吊工程载荷试验的常用方法。
This article introduces the basic situation of the large-scale deep-water pipelaying vessel’s float hoisting auxiliary hook and the main work preparation before the load test. By referring to the common practices of similar projects abroad, the key steps in the hoisting test process and the key inspection points Analysis, can be recommended for similar floating load test common method.