论文部分内容阅读
模板工程和混凝土工程是前后两道关系密切的工序,模板制作安装的质量将直接影响混凝土工程的质量,同样,模板拆除也会对混凝土结构工程产生很大的影响,过早或过迟拆,轻者会造成混凝土麻面等质量缺陷,重者会破坏其内在结构产生裂缝,因此混凝土结构施工过程中,拆模要掌握好时机,保证混凝土结构的质量,避免混凝土结构裂缝现象。本文就违规拆除模板给混凝土结构带来的危害及对混凝土结构的影响展开探讨。
Formwork and concrete engineering is the front and back two closely related processes, the quality of the template production and installation will have a direct impact on the quality of concrete engineering, the same template removal will have a significant impact on concrete structures, premature or late demolition, Light will result in quality defects such as concrete pitting, heavy will destroy the inherent structure of the cracks, so the construction process of concrete structures, demolition mold to grasp the good time to ensure the quality of concrete structures to avoid cracks in concrete structures. In this paper, illegal demolition of the template to the concrete structure and the impact on the concrete structure to start the discussion.