1991年10月,我院与能源部签订了“八五”国家重点科技攻关三项专题合同:1.“高强度大体积混凝土材料特性研究”。结合二滩拱坝施工设计,研究大体积混凝土的力学、热学、耐久性及破坏机理等;提高其使用强度,增强抗裂、抗冲耐磨能力;改善其物理性能,优化配合比设计。2.“混凝土防渗墙墙体材料及接头型式研究”。结合瀑布沟和小浪底高土石坝,研究新型的墙体材料、坝基防渗墙和坝体防渗体的连接型式,改善防渗墙的受力状态,在高水头作用下,使建于深厚覆盖层上的防渗墙和防渗体能联合安全运行。3.“勘测关键技术及综合应用研究”。主要是结合锦屏一级等电站,全面推广“六五”、“七五”勘测
October 1991, our hospital and the Department of Energy signed the “Eighth Five-Year” national key scientific and technological research three special contracts: 1. “High-strength large-volume concrete material properties.” Combined with the construction design of Ertan arch dam, the study of mechanical, thermal, durability and failure mechanism of mass concrete, etc .; improve its use strength, enhance crack resistance, abrasion resistance; improve its physical properties, optimize the mix design. 2 “concrete impervious wall material and joint type research.” Combining with Pubugou and Xiaolangdi high earth-rockfill dam, the connection between new type of wall materials, dam foundation seepage prevention wall and dam seepage control body is studied to improve the stress state of the seepage prevention wall. Under the action of high water head, Layer of impervious wall and seepage control can be combined with safe operation. 3. “Survey of key technologies and comprehensive application of research.” Mainly combined with Jinping first-class power plant, comprehensively promote the “Sixth Five-Year”, “Seventh Five-Year” survey