论文部分内容阅读
面对不容乐观的江河水源水质现状,净水厂处理工艺除常规处理外,还需考虑预处理及深度处理,或者在厂平面中预留场地,因此平面布置中处理构筑物单元众多,各单元间相互连接的各类管线繁复。在工艺流程顺畅、管理维护方便的条件下,对处理构筑物和辅助建筑物进行合理的组(叠)合布置,可以有效节省宝贵的土地资源,使得处理构筑物布置集中,功能分明且环境协调优美。为此,介绍了处理构筑物组(叠)合设计以及构筑物间连接设计方法,可供参考。
The face of the current optimistic water quality of rivers, the water treatment plant process in addition to conventional treatment, but also need to consider the pretreatment and depth treatment, or in the factory plane to reserve space, so the layout of the structure handling units many, between the units Various types of interconnected pipeline complex. Under the condition of smooth process and convenient management and maintenance, reasonable grouping and stacking of treatment structures and auxiliary buildings can effectively save precious land resources, make the disposal structures centralized, function clear and the environment coordinated and beautiful. To this end, introduced the handling of the building group (stack) design and connection between the structure design methods for reference.