为加强对珠江流域内水利工程造价咨询单位及造价工程师的管理,根据水利部《水利工程造价管理暂行规定》和《水利工程造价工程师资格管理暂行办法》,结合珠江的实际情况,最近,我委制定并颁布实施了《珠江水利工程造价咨询单位及造价工程师管理暂行办法》。该《暂行办法》共分4章21条,包括总则、水利工程造价咨询单位管理、水利工程造价工程师管理等,对
In order to strengthen the management of cost consulting units and cost engineers in the Pearl River Basin, according to the “Provisional Regulations on Water Conservancy Project Cost Management” and the “Provisional Measures on Qualification Management of Water Conservancy Project Cost Engineer”, combined with the actual situation in the Pearl River, Formulated and promulgated and promulgated the “Pearl River Water Conservancy Project Cost Consulting Unit and the cost of engineers Interim Measures.” The “Interim Measures” is divided into four chapters and 21 articles, including the general provisions of water conservancy project cost management consulting unit, water conservancy project cost engineer management, etc.