论文部分内容阅读
根据JGJ/T 104—2011《建筑工程冬期施工规程》的规定,室外日平均气温连续5d稳定低于5‰即进入冬期施工。起止日期可经实测确定,也可由甲、乙双方协商统一划定。问题来了,冬期施工混凝土工程主要检查内容都有哪些呢?我们一起来看。冬期施工混凝土工程主要检查内容
According to the provisions of JGJ / T 104-2011 “Winter Construction Procedures for Construction Projects”, outdoor daily average temperature is stable below 5 ‰ for 5 consecutive days and enters into winter construction. The starting and ending dates can be determined by measurement, but also by the two sides negotiate a unified delineation. The problem is, what are the main inspection contents of concrete construction in winter? We look together. Winter construction of concrete works main inspection content