论文部分内容阅读
为了加强水电机电安装行业之间的情极交流和资料积累,水电机电安装技术情报网曾发函各安装单位和一些水电厂,对国内历年来安装投产的大、中型水轮发电机组做了一个调查,承蒙各网员单位的大力协助和热情支持,仅致谢意。现将整理结果列表在网刊《水电机电安装技术》上分期刊载。由于安装队伍数次改变体制,“四人帮”的十年浩劫,加之过去对技术资料的积累、经济技术指标没有足够重视,致使表中所列不够准确,也不全面。为了向各网员单位以及本刊广大读者,提供尽可能全面和精确的技术资料,希望有关单位给予修正和补充。
In order to strengthen the exchange and accumulation of information between hydropower and electromechanical installation industries, the Hydropower Electromechanical Installation Technical Information Network sent a letter to all the installation units and some hydropower plants to make a survey on the large and medium-sized hydroelectric generating sets installed and put into operation in the country Survey, thanks to the various units of the strong support and enthusiastic support, only to thank. The results will now be arranged in the catalog “Hydroelectric installation of electricity” on the periodicals. Due to several changes in the system by the installation team and the ten-year “Gang of Four” catastrophe, coupled with the accumulation of technical information in the past, the economic and technical indicators did not pay enough attention to the fact that the table is not accurate enough nor comprehensive. In order to provide the most comprehensive and accurate technical information to all network members as well as our readers, I hope relevant units will give amendments and supplements.