列昂 -恩的列昂桥 ,是目前世界上最长的斜拉桥 ,该桥采用 BOT方式建设 ,预计 2 0 0 4年 12月建成通车。由于建桥场地属地震频发和地壳潜伏活动地带 ,地基条件恶劣给桥梁结构工程师带来了难以克服的困难和提出严峻的挑战。设计者采用本文开发的“包裹法”加固地基 ,在干船坞中预制巨型沉箱 ,浮运到位后注水下沉 ;在其上构筑独立的、刚性的塔墩固结体系 ;为了适应地壳微小运动、地震位移和温度变化等因素 ,采用连续桥面梁完全悬吊飘浮体系。深水基础施工独辟蹊径 ,采用提腿船施工和大型预制沉箱组装 ,加速施工进程
The Leonton bridge of Leon-en is the longest cable-stayed bridge in the world. The bridge is constructed by BOT and is expected to be completed and opened to traffic in December 2004. Due to frequent earthquakes and latent crustal activity, the poor foundation conditions have brought difficult problems for bridge structural engineers and raised serious challenges. The designer adopted the “parcel method” developed in this paper to reinforce the foundation, prefabricated the giant caisson in a dry dock, poured and sinked after the float was put in place, built an independent and rigid tower piers consolidation system on it, and in order to adapt to the tiny movement of the crust, Earthquake displacement and temperature changes and other factors, the use of continuous bridge beam completely suspended floating system. Deep-water foundation construction has its own way, with the tug boat construction and large prefabricated caissons assembly to speed up the construction process