论文部分内容阅读
通常情况下,低水头的取水防沙工程进行施工的过程中,通常情况下为了能够避免有害泥沙的出现,其布置形式都会做好相应的的纺纱措施。通过大量的研究证明来看,即便是低水头水电站凸岸取水防沙工程,只要能够采取科学合理的工程措施,便能够使得凸岸能够取到清水,最大限度的保证水电站运行的完善性。本篇文章主要以某水电站作为案例,来对于低水头水电站凸岸取水防沙工程措施进行了全面深入的研究,以期为我国水电站工程体系的完善作出贡献。
Normally, in the process of low water head and sand control project, usually, in order to avoid the appearance of harmful sediment, the arrangement form will make corresponding spinning measures. Proved by a large number of studies, even if the project of embankment water and sediment control of low head hydropower station can take scientific and reasonable engineering measures, it can make the embankment take clear water and ensure the operation of hydropower station to the maximum extent. This article mainly takes a hydropower station as a case study to conduct a comprehensive and in-depth study on the engineering measures for water intake and sediment control of the low-head hydropower station so as to contribute to the improvement of hydropower project system in China.