论文部分内容阅读
在沙特施工的中石化胜利油田物探公司沙特项目组从踏入沙特的第一天起,就为追求最高效率而努力,并通过不断优化资源配置提升运作水平,寻求最佳的生产方式。通过资源配置的不断优化和生产组织模式的持续创新,推动了生产效率的节节攀升。“动车组”施工模式,让生产环节实现无缝对接;方便快捷的后勤保障体系,解决了数百人的吃饭难题;高效的营地搬迁方式,搬迁时间由3天缩短为
The Saudi project team of Sinopec Shengli Oilfield Geophysical Company, which is under construction in Saudi Arabia, has been striving for the highest efficiency since the first day of entering Saudi Arabia and has been seeking the best mode of production by continuously optimizing the allocation of resources to upgrade its operation level. Through continuous optimization of resource allocation and continuous innovation in production and organization mode, the production efficiency has been promoted. “EMU ” construction mode, so that the production link to achieve seamless docking; convenient and efficient logistics support system to solve the problem of eating hundreds of people; efficient camp relocation methods, relocation time from 3 days to