为了尽快地开发金川资源,缓解国内镍供不应求的矛盾,1985年,国家决定建设金川二期工程,并列为“七五”重点项目之一,要求在1993年建成。该工程由北京有色冶金设计研究总院设计,承担矿山工程建设的(?)金川公司井巷工程公司、铁道部隧道局金川工程公司、兰州部队某部工(?)
In order to develop Jinchuan resources as soon as possible and to alleviate the contradiction in domestic supply of nickel, in 1985, the state decided to build the second phase of Jinchuan project, which was listed as one of the “Seventh Five-Year Plan” key projects and required completion in 1993. The project was designed by the Beijing Nonferrous Metallurgy Design and Research Institute, and it is responsible for the construction of mine projects (?) Jinchuan Corporation’s well and road engineering company, the Ministry of Railway Tunnel Bureau Jinchuan Engineering Company, and a certain Lanzhou troops (?)