论文部分内容阅读
南水北调工程压占灌区的灌溉面积,三部委关于《占用农业灌溉水源、灌排工程设施补偿办法》又无统一标准,不便于操作,且没有配套的强制措施和罚则,这就增加了协调工作和谈判的难度,如压占灌溉面积方不愿出补偿费,容易造成扯皮现在,使补偿费到不了位。等值替代补偿方案可作为水管单位与压占灌溉面积方进行谈判时用的,合理、实用的方案,并且双方都容易接受。在补偿费到位后,尚须作具体的施工设计方案。
The South-to-North Water Diversion Project takes up the irrigated area in the irrigated area. There is no uniform standard for the “three methods” for compensation for the occupation of agricultural irrigation water and irrigation and drainage facilities, which is inconvenient for operation and there are no compulsory measures and penalties, which increases the coordination work And the difficulty of negotiations, such as pressure on the area irrigated irrespective of compensation, easily lead to wrangling now, so that the compensation can not stop bit. Equivalent alternative compensation schemes can be used as a reasonable and practical solution for water management units negotiating with the area under pressure and accounting for irrigation and are easily accepted by both parties. After the compensation fee is in place, it is necessary to make a concrete construction design plan.