在现代建筑工程中,广泛使用钢筋混凝土结构。随着混凝土量的高速增长,作为模板的主要材料—木材,供需矛盾越来越大。为了解决这一矛盾,国家提出了以钢代木的技术政策, 收到了显著的效果。尤其是滑模机的使用,不但节省了大量的木材和钢材,也减少了模板制作、安装和拆除等繁琐工序。西安市最大的商店,目前正在施工。该工程系钢筋混凝土框架结构,建筑面积17884米~2,柱的断面直径有φ600毫米、φ700毫米的圆形柱,还有600×600,及700×700的方型柱,柱高5—7米,共计100多根,混凝土量达310米~3。如果用木模需要30米~3木材,若用钢模,则要为圆形柱制作一批钢模,工程完工后模板报废,浪费人力和物力,针对这一问题,我站试制了两台滑模机。
In modern construction projects, reinforced concrete structures are widely used. With the rapid increase in the amount of concrete, as the main material of the template - wood, the contradiction between supply and demand is increasing. In order to resolve this contradiction, the country put forward a technical policy of replacing steel with wood and received significant results. In particular, the use of slipform machines not only saves a lot of wood and steel, but also reduces the cumbersome procedures such as template fabrication, installation and demolition. Xi'an's largest store is currently under construction. The project is a reinforced concrete frame structure with a building area of 17884 m2. The section of the column has a diameter of φ600 mm and a diameter of φ700 mm. There are also square pillars of 600×600 and 700×700. The height of the pillar is 5-7. Meters, a total of more than 100 roots, concrete volume of 310 meters ~3. If the use of wood mold requires 30 meters to 3 pieces of wood, if steel molds are used, a batch of steel molds are to be made for the round columns. After the completion of the works, the templates will be scrapped and manpower and material resources will be wasted. In response to this problem, I stationed two units for trial production. Sliding mold machine.