论文部分内容阅读
介绍振冲碎石桩施工在北京北运河北关分洪枢纽改建工程中的应用,分析了在特殊地质条件下地基加固的问题.
This paper introduces the application of vibrating stone column construction in the reconstruction project of Bei Guan flood diversion hub in Beiyun, Beijing, and analyzes the problem of foundation consolidation under special geological conditions.