我市现有机电井48 33眼,排灌站34处,总装机0.6亿多瓦特,八五、八六两年,我们从机井入手开展了技术测试和改造试点,从中发现机械提水在节约能源、降低成本和提高经济效益方面有很大的节能潜力。二、机电井测改成果的考核分析妇踢年,在双辽县东、西辽河流域的水田井,中开始搞恻改试点,共测试了10眼井,有成果数据的是8眼。(见附表1)。但没有1眼井的装置效率是达到或比较接近规定指标;最高的为38 .6%,最低的仅14 .88%,
In the city, there are 48,33 electromechanical wells, 34 drainage and irrigation stations and a total installed capacity of over 60 million DWT. In 85 and 862 years, we started pilot testing and reforming pilot projects from the wells and found that mechanical lifting of water can save energy , Reduce costs and improve economic efficiency has great potential for saving energy. Second, the test results of mechanical and electrical wells test Women kick years, Shuangliao in East, West Liao River basin wells, began to engage in reform pilot, a total of 10 wells were tested, the results of the data is 8 eyes. (See Schedule 1). However, the efficiency of a well without a well is at or close to the specified target; the highest is 38.6% and the lowest is only 14.88%