【摘要】深基坑土方开挖施工是建筑施工中的一个重要组成部分,对建筑的整体发展起到了决定性的作用,并且直接制约着建筑施工的质量和进度,因此需要加强对深基坑土方开挖工作的重视。本文分析了建筑深基坑土方开挖施工的方法,并对施工的要点进行探讨,目的是为建筑深基坑土方开挖的施工提供指导和借鉴,进而推动建筑施工工作的顺利开展。
【关键词】深基坑;土方开挖;施工要点
Discussion on Key Construction Techniques for Excavation of Deep Foundation Pit
Shen Xiao-dong,Fang Yao
(Zhejiang Southeast Construction Management Co., LtdHuzhouZhejiang313000)
【Abstract】The excavation of deep excavation is an important part of the construction. It plays a decisive role in the overall development of the building and directly restricts the quality and progress of the construction. Therefore, it is necessary to strengthen the excavation work on the deep foundation pit The attention. This paper analyzes the method of earth excavation in deep foundation pit of construction, and discusses the main points of construction. The purpose is to provide guidance and reference for the construction of earth excavation in deep foundation pit, and to promote the smooth development of construction work.
【Key words】Deep excavation;Earth excavation;Construction points
对于深基坑挖土来说,它是基坑工程的重要组成部分,同时,也是基坑工程中最具复杂性的系统工程建设之一。随着近几年来高层、超高层建筑的日益增多,深基坑土方开挖技术也具有举足轻重的地位。对于深基坑的开挖来说,它要求挖掘的土方数量相对比较大。从某种程度上说,基坑工程挖土的速度对基坑工程工期的长短也起着决定性的作用,毋庸置疑,挖土的速度越快,基坑工程所需的工期越短,可以说挖土的速度与工期的长短成反比。此外,挖土这一阶段还影响着支护结构的强度及变形控制是否能达到预期的要求及目的,由此看来,基坑开挖的质量控制也是影响整个基坑工程是否顺利实施的决定因素之一。
1. 深基坑土方开挖施工概述
万丈高楼平地起,它的高度是由一块块砖瓦累积起来的。而它的地基就如一个树的根一样,树无根自然不能正常生长,同时也会被袭来的风摧枯拉朽。实际上,树的根越深、越扎实越具有生命力,对于万丈高楼来说也是如此,必有扎实的地基才能保证寿命的长久,可以说,地基是决定楼房质量的因素之一,尤其是一些高层、超高层的建筑。因此深基坑开挖具有不可颠覆的重要性。那么如何保证深基坑土开挖施工技术的有效实施呢?这就需要我们在基坑土方开挖之前,对施工地区范围内环境及地形进行细致的考察,并对其做详细的分析了解。除此之外,还要对土层的种类以及土层的特性进行考察,并绘制与实际相符的施工图,同时,在施工过程中要依照施工图对地下设施的情况进行全面透彻的了解。还要对支护结构的施工质量加以重视,并合理地对挖土机械及运输设备进行优化配置,从而优化土方运输的出人口。另外,还要以有关政府与部门对土方外运的要求以及规定为基础,确定最佳的挖土方案以及施工组织方案。与此同时,还要在基坑开挖的过程中对支护结构、地下水位以及周围的环境进行必要的监护。从目前来看,普遍应用的基坑开挖技术主要包括中心岛式挖土、盆式挖土、放坡挖土以及逆作法挖土等。
2. 深基坑土方开挖的技术分析探究
(1)中心岛式挖土技术探析。
中心岛式挖土技术适合于大型的深基坑开挖,它应用的支护结构的支撑形式主要有环梁式.边桁架式以及角撑。对于中心岛式挖土来说,它能有效地提高挖土以及运土的效率。挖土机可将挖土过程中中间出现的土墩作为搭设栈桥的支点,然后再利用栈桥下至基坑进行挖土,另外,运土的车辆也可以对栈桥加以利用,下至基坑内将土运输出来。采用中心岛式挖土,需要对中间土墩的高度、坡度以及稳定性进行认真的验证,尤其是在雨季的时候,还要加固边坡,以此来防止土墩边坡的滑坡。而在挖土的过程中还要进行分层处理,普遍的做法是先挖去第一层,使中间部位出现一个土墩,然后再分层对周围的部位开挖。此时要注意的是尽量减小暴露的时间,在每挖至规定标高以后,要及时安装钢支撑,最大限度也不可超过一昼夜。而对于混凝土的支撑也不能超过两昼夜。中心島式土方开挖也有一定的顺序要求,要求其必须要与支护结构的设计状况保持一致,同时也要按照先支撑后挖掘、分层开挖的原则进行。对于挖土机以及运土车辆来说,要禁止其直接通过支撑点。
(2)深基坑放坡挖土技术探析。
深基坑放坡挖土技术具有一定的优越性,这种优越性主要表现在其本身具有一定的经济效益,还具有较高的挖土效率。当这种技术应用在深度较大的基坑时,就需要设置多级平台进行分层开挖。要求所设置的每级平台的宽度都要大于1.5米,另外,还要求在放坡开挖的过程中要对边坡的稳定性进行测算,所采用的测算方法主要是圆弧滑动简单条分法。从以往的实验结果分析来看,分级放坡土方开挖应在降雨量较小的月份进行比较适宜,这样才便于较好地满足排水的要求。而在施工的过程中,还要采取切实可行的措施,以此来使得基坑内部水位的降低,并有效地排除地表水,从而控制或避免地表水以及基坑内部排出的水回渗到基坑内。另外,为了确保坡体的稳定性,还要采用混凝土堆外露的土坡进行保护。而且在放坡挖土的过程中,还要在中间的平台留出足够的宽度,对于土坡的坡度来说也不要太陡,满足要求即可。 (3)盆式挖土技術探析。
高层建筑楼基坑土方工程施工中盆式土方开挖施工应用也相对较多,施工特点为在进行基坑中间区域土体的开挖施工,完成中间土体开挖施工之后再进行剩余周边土体的开挖,同时采取施工措施控制基坑与周围土体的变形。基坑土方盆式开挖将基坑划分为盆中部分与盆厚部分两部分,为了确保基坑土方开挖施工作业的安全顺利进行,还应该对盆厚部分,即基坑周边预留土体位置的宽度、坡度以及高度等详细的施工参数进行稳定性的验算,以免由于盆厚部分预留尺寸过小造成开挖过程中出现失稳滑动的问题。
(4)逆作法挖土技术探析。
逆作法挖土技术也具有一定优势,这种优势主要是针对变形控制、可持续发展等方面来谈的。对于高层建筑或多层地下室等的土方开挖来说,逆作法挖土是一种切实可行的方法。它的施工顺序是自上而下的,而它的基坑支护作用也是借助地下室的楼板的抗压强度以及水平的刚度来实现的,基坑支护作用的实现在一定程度上保证了基坑土方的开挖。对于地下室楼板的结构来说,它的施工顺序主要也是自上而下的。一般情况下,在楼板结构施工之前,地下室的结构柱是不能完成的,所以要对其进行竖向临时支撑添加,以保证其支撑作用的发挥。
3. 深基坑土方开挖的施工技术要点
3.1合理选择边坡支护方案。
在高层建筑楼支护结构形式的选择上,当前较多的选择使用水泥档土墙、排桩与板墙、边坡稳定式支护结构以及逆作拱墙等几种支护结构形式在施工中应该根据施工项目区域的实际水文地质、作业场地、施工工期以及造价要求等合理的
选择支护施工方案。
3.2做好降水施工。
为了确保基坑开挖施工作业的顺利完成,在基坑土方开挖施工中应将基坑降水排水作为施工的重点,在基坑开挖的中央区域可以采用降水井,在基坑内部可以设置纵向或者是横向的排水盲沟由于采用排水以及降水措施后,会对原地下水位平衡造成影响,甚至会由于渗流造成基坑变形问题的发生,因此除了采取降水以及排水措施以外,还应该采取相应的回灌等方式来削弱由于降水对周边环境所造成的影响。
3.3基坑土方开挖安全施工措施。
为了确保基坑土方开挖作业的顺利实施:①在工程施工过程中应该采取合理的基坑变形监测,通过设置基准点,重点对基坑土方开挖施工中的位移速率、沉降量以及地下水位变化情况等内容进行施工监测;②对于基坑土方施工作业过程中出现裂缝、大变形或者是失稳等突发险情,应该采取降低土体剪应力与提高土体杭剪强度的措施进行紧急处理,具体措施主要有坡脚临时压重、坡顶主动减载、临时加固支护结构以及做好封面处理等措施。
3.4基坑土方开挖施工的后期监测。
在实践和调查中发现,很多建设活动在深基坑开发完成后就立即进行,而由于此产生的建筑难题也不断增加,比如深基坑结构不吻合,深基坑稳定性差等因此深基坑的后期检测是必要的,这种检测技术的提高也能在一定程度上保证整体工程的顺利开展首先建筑者要派专业人才对深基坑与工程的吻合度进行检测,利用专业设备检查其不合理的地方此外还要对其安全性和稳定性进行检测.主要研究其结构形态的牢固程度,必要时进行稳定性测试工程中的细节问题一般难以在具体施工中被注意到,因此这种后期监测的步骤是必不可少的,后期监测的技术也是需要提高的,这对建筑工程的整体发展有着重要意义。
4. 结束语
随着城市化进场的逐渐深入,高层建筑越来越多,深基坑工程不断增加,而基坑工程的影响因素越来越复杂多变,因此深基坑工程的施工应该是周密的施工步骤,合理的部署,完善的施工技术。
参考文献
[1]郭睿.浅析大型建筑深基坑土方开挖的施工要点[J].中国科技纵横,2012 (7).
[2]侯世英.深基坑分层开挖施工技术及要点[J].科技创新导报,2011 (02).
[文章编号]1619-2737(2017)03-16-580
【关键词】深基坑;土方开挖;施工要点
Discussion on Key Construction Techniques for Excavation of Deep Foundation Pit
Shen Xiao-dong,Fang Yao
(Zhejiang Southeast Construction Management Co., LtdHuzhouZhejiang313000)
【Abstract】The excavation of deep excavation is an important part of the construction. It plays a decisive role in the overall development of the building and directly restricts the quality and progress of the construction. Therefore, it is necessary to strengthen the excavation work on the deep foundation pit The attention. This paper analyzes the method of earth excavation in deep foundation pit of construction, and discusses the main points of construction. The purpose is to provide guidance and reference for the construction of earth excavation in deep foundation pit, and to promote the smooth development of construction work.
【Key words】Deep excavation;Earth excavation;Construction points
对于深基坑挖土来说,它是基坑工程的重要组成部分,同时,也是基坑工程中最具复杂性的系统工程建设之一。随着近几年来高层、超高层建筑的日益增多,深基坑土方开挖技术也具有举足轻重的地位。对于深基坑的开挖来说,它要求挖掘的土方数量相对比较大。从某种程度上说,基坑工程挖土的速度对基坑工程工期的长短也起着决定性的作用,毋庸置疑,挖土的速度越快,基坑工程所需的工期越短,可以说挖土的速度与工期的长短成反比。此外,挖土这一阶段还影响着支护结构的强度及变形控制是否能达到预期的要求及目的,由此看来,基坑开挖的质量控制也是影响整个基坑工程是否顺利实施的决定因素之一。
1. 深基坑土方开挖施工概述
万丈高楼平地起,它的高度是由一块块砖瓦累积起来的。而它的地基就如一个树的根一样,树无根自然不能正常生长,同时也会被袭来的风摧枯拉朽。实际上,树的根越深、越扎实越具有生命力,对于万丈高楼来说也是如此,必有扎实的地基才能保证寿命的长久,可以说,地基是决定楼房质量的因素之一,尤其是一些高层、超高层的建筑。因此深基坑开挖具有不可颠覆的重要性。那么如何保证深基坑土开挖施工技术的有效实施呢?这就需要我们在基坑土方开挖之前,对施工地区范围内环境及地形进行细致的考察,并对其做详细的分析了解。除此之外,还要对土层的种类以及土层的特性进行考察,并绘制与实际相符的施工图,同时,在施工过程中要依照施工图对地下设施的情况进行全面透彻的了解。还要对支护结构的施工质量加以重视,并合理地对挖土机械及运输设备进行优化配置,从而优化土方运输的出人口。另外,还要以有关政府与部门对土方外运的要求以及规定为基础,确定最佳的挖土方案以及施工组织方案。与此同时,还要在基坑开挖的过程中对支护结构、地下水位以及周围的环境进行必要的监护。从目前来看,普遍应用的基坑开挖技术主要包括中心岛式挖土、盆式挖土、放坡挖土以及逆作法挖土等。
2. 深基坑土方开挖的技术分析探究
(1)中心岛式挖土技术探析。
中心岛式挖土技术适合于大型的深基坑开挖,它应用的支护结构的支撑形式主要有环梁式.边桁架式以及角撑。对于中心岛式挖土来说,它能有效地提高挖土以及运土的效率。挖土机可将挖土过程中中间出现的土墩作为搭设栈桥的支点,然后再利用栈桥下至基坑进行挖土,另外,运土的车辆也可以对栈桥加以利用,下至基坑内将土运输出来。采用中心岛式挖土,需要对中间土墩的高度、坡度以及稳定性进行认真的验证,尤其是在雨季的时候,还要加固边坡,以此来防止土墩边坡的滑坡。而在挖土的过程中还要进行分层处理,普遍的做法是先挖去第一层,使中间部位出现一个土墩,然后再分层对周围的部位开挖。此时要注意的是尽量减小暴露的时间,在每挖至规定标高以后,要及时安装钢支撑,最大限度也不可超过一昼夜。而对于混凝土的支撑也不能超过两昼夜。中心島式土方开挖也有一定的顺序要求,要求其必须要与支护结构的设计状况保持一致,同时也要按照先支撑后挖掘、分层开挖的原则进行。对于挖土机以及运土车辆来说,要禁止其直接通过支撑点。
(2)深基坑放坡挖土技术探析。
深基坑放坡挖土技术具有一定的优越性,这种优越性主要表现在其本身具有一定的经济效益,还具有较高的挖土效率。当这种技术应用在深度较大的基坑时,就需要设置多级平台进行分层开挖。要求所设置的每级平台的宽度都要大于1.5米,另外,还要求在放坡开挖的过程中要对边坡的稳定性进行测算,所采用的测算方法主要是圆弧滑动简单条分法。从以往的实验结果分析来看,分级放坡土方开挖应在降雨量较小的月份进行比较适宜,这样才便于较好地满足排水的要求。而在施工的过程中,还要采取切实可行的措施,以此来使得基坑内部水位的降低,并有效地排除地表水,从而控制或避免地表水以及基坑内部排出的水回渗到基坑内。另外,为了确保坡体的稳定性,还要采用混凝土堆外露的土坡进行保护。而且在放坡挖土的过程中,还要在中间的平台留出足够的宽度,对于土坡的坡度来说也不要太陡,满足要求即可。 (3)盆式挖土技術探析。
高层建筑楼基坑土方工程施工中盆式土方开挖施工应用也相对较多,施工特点为在进行基坑中间区域土体的开挖施工,完成中间土体开挖施工之后再进行剩余周边土体的开挖,同时采取施工措施控制基坑与周围土体的变形。基坑土方盆式开挖将基坑划分为盆中部分与盆厚部分两部分,为了确保基坑土方开挖施工作业的安全顺利进行,还应该对盆厚部分,即基坑周边预留土体位置的宽度、坡度以及高度等详细的施工参数进行稳定性的验算,以免由于盆厚部分预留尺寸过小造成开挖过程中出现失稳滑动的问题。
(4)逆作法挖土技术探析。
逆作法挖土技术也具有一定优势,这种优势主要是针对变形控制、可持续发展等方面来谈的。对于高层建筑或多层地下室等的土方开挖来说,逆作法挖土是一种切实可行的方法。它的施工顺序是自上而下的,而它的基坑支护作用也是借助地下室的楼板的抗压强度以及水平的刚度来实现的,基坑支护作用的实现在一定程度上保证了基坑土方的开挖。对于地下室楼板的结构来说,它的施工顺序主要也是自上而下的。一般情况下,在楼板结构施工之前,地下室的结构柱是不能完成的,所以要对其进行竖向临时支撑添加,以保证其支撑作用的发挥。
3. 深基坑土方开挖的施工技术要点
3.1合理选择边坡支护方案。
在高层建筑楼支护结构形式的选择上,当前较多的选择使用水泥档土墙、排桩与板墙、边坡稳定式支护结构以及逆作拱墙等几种支护结构形式在施工中应该根据施工项目区域的实际水文地质、作业场地、施工工期以及造价要求等合理的
选择支护施工方案。
3.2做好降水施工。
为了确保基坑开挖施工作业的顺利完成,在基坑土方开挖施工中应将基坑降水排水作为施工的重点,在基坑开挖的中央区域可以采用降水井,在基坑内部可以设置纵向或者是横向的排水盲沟由于采用排水以及降水措施后,会对原地下水位平衡造成影响,甚至会由于渗流造成基坑变形问题的发生,因此除了采取降水以及排水措施以外,还应该采取相应的回灌等方式来削弱由于降水对周边环境所造成的影响。
3.3基坑土方开挖安全施工措施。
为了确保基坑土方开挖作业的顺利实施:①在工程施工过程中应该采取合理的基坑变形监测,通过设置基准点,重点对基坑土方开挖施工中的位移速率、沉降量以及地下水位变化情况等内容进行施工监测;②对于基坑土方施工作业过程中出现裂缝、大变形或者是失稳等突发险情,应该采取降低土体剪应力与提高土体杭剪强度的措施进行紧急处理,具体措施主要有坡脚临时压重、坡顶主动减载、临时加固支护结构以及做好封面处理等措施。
3.4基坑土方开挖施工的后期监测。
在实践和调查中发现,很多建设活动在深基坑开发完成后就立即进行,而由于此产生的建筑难题也不断增加,比如深基坑结构不吻合,深基坑稳定性差等因此深基坑的后期检测是必要的,这种检测技术的提高也能在一定程度上保证整体工程的顺利开展首先建筑者要派专业人才对深基坑与工程的吻合度进行检测,利用专业设备检查其不合理的地方此外还要对其安全性和稳定性进行检测.主要研究其结构形态的牢固程度,必要时进行稳定性测试工程中的细节问题一般难以在具体施工中被注意到,因此这种后期监测的步骤是必不可少的,后期监测的技术也是需要提高的,这对建筑工程的整体发展有着重要意义。
4. 结束语
随着城市化进场的逐渐深入,高层建筑越来越多,深基坑工程不断增加,而基坑工程的影响因素越来越复杂多变,因此深基坑工程的施工应该是周密的施工步骤,合理的部署,完善的施工技术。