论文部分内容阅读
介绍了深圳一高层建筑的空调设计概况以及风冷热泵冷水机组机房的设计安装。分析了工程安装调试中出现的机房温度过高的原因 ,提出并通过评估确定了最佳的解决方案。
Introduced the air conditioning design of a high-rise building in Shenzhen and the design and installation of the air-cooled heat pump chiller room. The reasons for the high temperature in the equipment room during the installation and debugging of the project were analyzed, and the best solution was proposed and evaluated.