本文是在丹江口水电站1、2、4号机上为“○七工程”所作冲击负荷试验研究的初步总结。文中指出了水电机组不能适应冲击负荷的问題所在,提出了解决这些问题的途径和措施。
This paper is a preliminary summary of the impact load test conducted by the “○ 7 Project” on Danjiangkou Hydropower Station No.1, No. 2 and No. 4 aircraft. The article pointed out that the hydropower unit can not meet the impact of the load where the problem, put forward ways and measures to solve these problems.