论文部分内容阅读
蓬辣滩水电站的升压站,在施工中改变了原设计,更改设计后升压站的施工过程中遇到新问题,原地质资料与现实差异很大。文章就升压站的防渗、沉降处理作了探讨。
Penglaotan Hydropower Station booster station changed the original design during construction, and encountered new problems in the construction of the booster station after the design was changed. The original geological data are very different from the reality. The article discusses the anti-seepage and settlement treatment of booster station.