承承500kV输电线路工程沿线地形以高山大岭为主,地表植被茂密,树木密集,且沿线村庄较少,交通运输十分困难。结合现场地形、地貌施工特点和我公司的施工经验,希望通过采用循环式索道运输施工技术解决工程材料、器材运输的难题,同时探寻即将出版的《电力建设工程预算定额(输电线路工程架空货运索道运输)》在工程造价方面对施工企业现状的影响。
The topography of the 500kV power transmission line along the line is dominated by high mountain and big ridge with dense vegetation and dense trees, and few villages along the line. Transportation is very difficult. Combined with the characteristics of site topography and landform construction and construction experience of our company, we hope to solve the problem of transportation of engineering materials and equipment through the construction technology of circulating ropeway transportation. At the same time, we are going to explore the forthcoming publication of “Electricity construction project budget quota (Transmission line project overhead freight cableway Transport) ”in the construction cost of the status of construction enterprises.