论文部分内容阅读
治水历程1951年,毛泽东主席发出了“一定要把淮河修好”的伟大号召,数万中华儿女从祖国各地云集江淮大地,掀起了轰轰轰烈烈的治淮运动。1952年,江苏水建这支当时的治淮队伍应运而生。60年来,江苏水建人秉承“工程报国”的理念,积极承担水利基础设施建设任务,先后建设的以江都水利枢纽、淮安水利枢纽、泰州引江河枢纽、淮河入海水道、淮河入江水道、南水北调东线多个梯级泵站以及沂沭泗流域、太湖流域整治工程等为代表的300多项体量大、技术复杂、施工难度高的大中型工程项目,
In 1951, Chairman Mao Zedong issued a great call for “repairing the Huaihe River.” Tens of thousands of Chinese sons and daughters gathered in the Jianghuai Territory from all over the motherland, setting off a vigorous campaign of governing Huaihe. In 1952, Jiangsu Hydropower Construction this time the Huai team emerged. Over the past 60 years, Jiangsu Waterlooer has been adhering to the concept of “Providing Services to Countries” and has taken on the task of water conservancy infrastructure construction. The water conservancy project of Jiangdu Hydroelectric Project, Huaian Water Conservancy Project, Taizhou River Importing Waterway, Huaihe River Waterway, South-to-North Water Diversion East a number of cascade pump stations and the Yishusi watershed, the Taihu Lake Basin renovation project as represented by more than 300 large-scale, complex technology, construction of large and medium-sized high-difficulty projects,