论文部分内容阅读
近年来在大型水力樞紐建設工程中广泛应用所謂桮欧ɡ礉仓炷痢U飧龇椒ǖ氖蒂|是这样的:在修建中的建筑物范圍內,沿其縱向中心綫架設金屬栈桥,桮诺囊欢诉B接到安置工程生产企業的岸上。在桮派掀躺枳盘?用铁路將流态混凝土料罐、鋼筋桁架、鋼筋束模板、壳板、埋設部件、設备構件等运輸至整个工作面去。桮派习仓玫目梢剖狡?
In recent years in the large-scale hydraulic hub construction project is widely used in the so-called cup 礉 炷 炷 diarrhea U 飧 龇 pepper ǖ Neodymium | is this: within the framework of the building under construction, erected along its longitudinal centerline metal trestle bridge , Cup Nuobu plea B receiving the placement of production enterprises onshore. Lift the cup in the cup pie holdup? With the flow of concrete tank material, steel truss, tendons template, shell, buried components, equipment components transported to the entire face to go. Cup school faction warehouse rose tip cut cunning?