洪泽站工程于2011年1月正式开工,并在2013年3月顺利通过江苏水源公司组织的试运行验收。2013年4月通过省南水北调办组织的通水验收。洪泽站是南水北调东线第一期工程的第3级抽水泵站,工程的主要任务是抽水入洪泽湖,与淮阴泵站梯级联合运行,使入洪泽湖流量规模达到450m3/s,以向洪泽湖周边及以北地区供水,并结合宝应湖地区排涝。
Hongze Station Project was officially started in January 2011 and successfully passed the trial run of Jiangsu Water Source Company in March 2013 for acceptance. In April 2013, it passed the water inspection and acceptance organized by the Provincial South-to-North Water Diversion Project. Hongze Station is the third stage pump station of the first stage of the South Route of South-to-North Water Diversion Project. The main task of the project is to pump water into Hongze Lake and run in conjunction with the cascade of Huaiyin Pump Station, bringing the flow into Hongze Lake to 450m3 / s, So as to supply water to the areas around Hongze Lake and the north of the lake and to combine drainage with the Baoying Lake area.