“六五”期间,水电建设发展很快,装机总容量由二千零三十一点八万千瓦发展到二千六百万千瓦以上;年发电量由五百八十多亿度增至九百亿度右左.在这一期间,一批大中型水电工程建成投产,其中有九十六点五万千瓦的葛州坝一期、九十万千瓦的白山一期、四十万千瓦的大化水电站等等.“六五”期间,还有一批总建设规模为一千一百万千瓦的在建一程.有被列为1985年国家重点的项目:龙羊峡(128万)、安
During the “6th Five-Year Plan” period, hydropower construction developed rapidly. The total installed capacity increased from 20,130,800 kilowatts to 26 million kilowatts or more; the annual power generation increased from 5,800 billion to 9 In this period, a number of large and medium-sized hydropower projects were completed and put into production, including 956,000 kilowatts of Gezhouba Phase I, 900,000 kilowatts of Baishan Phase 1, 400,000 kilowatts of Dahua Hydropower Station. And so on. During the “6th Five-Year Plan” period, there are still a group of construction projects with a total construction volume of 11 million kilowatts. There are projects listed as national priorities in 1985: Longyangxia (1.28 million),