法国多尔多涅河上的博尔莱索格电站现有两台机组, 拟扩装一台100MW 的竖轴混流式水轮机。已对电站进行了部分改造, 以便用新机组取代80 年代拆除的转桨式水轮机。介绍了项目设计期间遇到的复杂问题及在增容改造工程施工期间必须解决的难题
There are two existing units at Borlesauger Power Station on the Dordogne River in France, and a 100MW vertical-axis Francis turbine is planned to be expanded. The power station has been partially rebuilt in order to replace the Kaplan turbine dismantled in the 1980s with a new one. Introduced the complex problems encountered during the project design and the problems that must be solved during the construction of the capacity expansion and transformation project