论文部分内容阅读
长春市市政工程设计研究院始建于1953年。60年来,经过几代设计院人的不懈努力和奋斗,设计院不断地发展壮大,由功能单一的政府科室,发展成为具有工程勘察综合甲级和市政工程道路、桥隧、给水、排水设计以及工程咨询、市政工程监理甲级资质,以及工程测绘、公路工程设计、风景园林设计、建筑工程设计、城市规划等相应等级资质实力雄厚的市政设计企业。可承担道路、桥梁、给排水、防洪、工业与民用建筑设计、城市规划编制、工程地质、水文地质、岩土工程勘察、工程测量和市政工程课题研究等任务。并可承揽土木、建筑材料、污水处理试验及市政工程监理、市政工程咨询、总承包等任务。建院60年来,为长春市建设发展做出了巨大贡献。先后完成了第一汽车制造厂、长春客车厂、长春电机厂、长春卷烟厂、长春造纸厂、吉林柴油机厂等大型重点企业厂区及路网的勘测任务;完成了长春市二级三角网、基线网、导线点、水准网的测绘工作,为长春市的大规模城市基础建设奠定了基础;完成了黑嘴子双曲拱桥、西朝阳桥、东荣大桥、南湖大桥、长春大桥、长春市二环路、三环路、四环路、
Changchun Municipal Engineering Design and Research Institute was founded in 1953. Over the past 60 years, after several years of unremitting efforts and struggles by design institutes, the Design Institute has continuously grown and developed from a single-function government department to a comprehensive engineering and construction site with Grade A and municipal engineering roads, bridges and tunnels, water supply and drainage design and Engineering consulting, municipal engineering supervision grade A qualification, as well as engineering surveying and mapping, highway engineering design, landscape architecture design, construction design, urban planning and other corresponding level qualification strength of municipal design enterprises. Can undertake the road, bridge, water supply and drainage, flood control, industrial and civil architecture design, urban planning, engineering geology, hydrogeology, geotechnical investigation, engineering surveying and municipal engineering research tasks. And contract civil engineering, construction materials, sewage treatment test and municipal engineering supervision, municipal engineering consulting, general contracting and other tasks. Since its establishment 60 years ago, it has made great contributions to the construction and development of Changchun. Completed the first automobile factory, Changchun Bus Factory, Changchun Motor Factory, Changchun Cigarette Factory, Changchun Paper Mill, Jilin Diesel Engine Plant and other large key enterprises of the plant and road network survey tasks; completed Changchun City, two triangulation, the baseline Network, wire points, leveling network mapping work for the large-scale urban infrastructure Changchun laid the foundation; completed the Black Mouth Double Curved Arch Bridge, West Chaoyang Bridge, East Wing Bridge, Nanhu Bridge, Changchun Bridge, Changchun City, the second ring Road, Third Ring Road, Fourth Ring Road,