山东省邹平县为解决水源不足问题,充分发挥引黄灌区的作用,大搞向南部山区和东部井灌区等远、高、难地片调水补源工程。但由于送水距离远,地下水位深,兴建的调水工程大都沟深口宽,弃土量大,占用耕地较多。为此,他们在抓好水利建设的同时,注重采取有效措施,开辟多条途径,减少水利工程占地,并已收到显著效果。其办法:
Zouping County, Shandong Province to solve the problem of inadequate water supply, give full play to the role of the Yellow River Irrigation District, vigorously to the southern mountainous areas and the eastern well irrigation and other far, high and difficult film water recharge project. However, due to the long distance of water supply and the deep groundwater level, most of the water diversion projects under construction are dug deep, wide of spoil, and occupy more cultivated land. Therefore, while doing a good job in water conservancy construction, they pay attention to adopting effective measures and opening up various channels to reduce the land occupation of water conservancy projects and have achieved remarkable results. Its approach: