沈阳西站是东北路网的最大编组站,也是全国大型路网性编组站之一,是东北地区沟通关内外铁路运输的主要交通枢纽。站场布置为双向二级六场,设计改编能力为12,000辆。下行编组场为半自动化驼峰。峰下设三个部位车辆减速器,进行车辆的间隔和目的制动。编组线股道内仍采用铁鞋进行制动。 该站新建的上下行编组场,1984年先后投产使用。铁道部第三设计院1982年10月的设计文件规定,上行编组场按半自动化驼峰设计,下行编组场按机械化驼峰设计,预留发展半自动化及自动化条件,上下行驼峰头部设两级制动位,第一制动位采用T·JK型减速器(5+5节),第二制动位采用T·JK型减速器(6+6节),上行车场第三制动位采用7501型减速器(6+6节)并预留第四制动位。远期第四制动位出口后实现自动化时,原则上按加速设备考虑。下行车场预留第三制动位,编组场内装没脱鞋器,上行编组场设一排,下行编组场设两排。
Shenyang West Railway Station is the largest marshalling station of the Northeast Road Network and one of the major marshalling stations in the country. It is also the major transportation hub for the communication between the inside and outside of the Northeast China. Station layout for the two two two games, design adaptation capacity of 12,000 vehicles. Down the marshalling yard for the semi-automatic hump. Peak under the three parts of the vehicle reducer, vehicle separation and purpose of braking. Grouping lines still use iron shoes brake. The new construction of the station on the line group, 1984 has put into operation. The Design Institute of the Third Design Institute of the Ministry of Railways in October 1982 stipulated that the upper marshalling yard should be designed according to semi-automatic hump design and the lower marshalling yard should be mechanized hump design. Semi-automatic and automatic conditions should be reserved for development. The first brake position adopts T · JK type reducer (5 + 5 knuckles), the second brake position adopts T · JK type reducer (6 + 6 knuckles), and the third braking position in the upper lane is used Model 7501 gear unit (6 + 6) and reserve the fourth brake bit. Long-term fourth brake output after the exit automation, in principle, according to the acceleration equipment to consider. Third parking brake reserved for the parking lot, no shoes removed in the assembly yard, one row in the upper yard and one row in the lower yard.