论文部分内容阅读
成都至都江堰客运专线(简称成灌铁路)工程是“5·12”大地震后,铁道部与四川省签订的第一个灾后重建大型基建项目。作为连接成都中心城区与周边区(市)县的第一条快速轨道交通线路,成灌铁路的科技含量很高,高架桥长达40多公里,占全线总长的
Chengdu to Dujiangyan Passenger Dedicated Line (referred to as Irrigation Railway) project is “512 ” earthquake, the Ministry of Railways and Sichuan Province signed the first after the reconstruction of large-scale infrastructure projects. As the first rapid rail transit line linking the downtown area of Chengdu to the surrounding districts (cities) and counties, Chenghua Railway has a high scientific and technological content with over 40 kilometers of viaducts, accounting for a total length of