一、自然条件简述隔河岩枢纽位于鄂西长阳县城上游9公里.为清江流域规划中推荐的第一期工程。建成后将成为华中电网骨干电站之一。坝址两岸均为陡坡,但左岸在110~120米高程以上的山坡平缓,山体散乱。而右岸山体整齐雄厚。枯水河面宽约120米,水深一般3米,最深达10米。河床沙卵石覆层厚8
I. Brief Description of Natural Conditions Geheyan Hub is located 9 kilometers upstream of Changyang County in western Hubei Province and is the first phase of the project recommended in the planning of Qingjiang River Basin. Upon completion, it will become one of the backbone power plants in Huazhong Power Grid. Both sides of the dam site are steep slopes, but the slope on the left bank above the elevation of 110 to 120 meters is gentle and the mountains are scattered. The right bank of the mountain neatly. Dry river is about 120 meters wide, water depth is generally 3 meters, the deepest up to 10 meters. Thick bed of sand and gravel 8