论文部分内容阅读
On October 22 this year, the Liaoning-Changchun-Jilin-Harbin-Jiamusi 500 kV transmission and substation projectpassed the acceptance test. It was judged the excellent grade.The transmission line has a total length of 1064 km and is thesecond network fr