论文部分内容阅读
衡阳巴可综合楼转换层预应力现浇桁架,受施工场地环境限制和工程进度对施工要求的影响,施工中采用不对称偏心张拉方法,本文着重介绍了施工中解决的技术问题。
The prestressed cast-in-place trusses in the transition layer of Hengyang Barco Complex Building are affected by the construction site environmental restrictions and construction schedules. The construction method uses an asymmetrical eccentric tension method. This paper focuses on the technical problems solved during construction.