贺西矿主提升皮带机在经过井口变坡点时,由于输送带经过凸弧段曲率半径小,造成皮带机运行阻力增大,提升能力达不到皮带机的设计要求,输送带边缘开胶、绳芯断丝,主提升皮带机存在很大的安全隐患。为此对贺西矿主提升系统进行了改造。在未改变主皮带机电动机功率、减速器、液力偶合器、机头架主结构及其安装基础的的情况下,就使主提升系统的提升能力大大提高。不仅满足了矿井生产需要,而且消除了主皮带机的安全隐患,确保了矿井安全生产。
Hexi mine main lifting belt machine through the well head becomes slope point, due to the curvature radius of the conveyor belt through the convex arc is small, resulting in increased running resistance of the belt machine to enhance the ability to reach the design requirements of the belt conveyor belt edge plastic, Broken wire rope, the main belt conveyor there is a big security risk. To this end Hexi main upgrade system has been transformed. Without changing the main belt motor power, reducer, hydraulic coupling, headstock main structure and installation of the foundation case, the main lifting system to enhance the ability to greatly enhance. Not only to meet the needs of mine production, but also eliminates the main belt of the security risks and ensure mine safety.