宝鸡市渭河治理,每年新建、改建堤防约8公里,加之堤防工程维修、养护,年用石量约需6万多米~3,实际上当地石料不但规格无法保证,而且在数量上也难以完成。为了解决石源不足的问题,八十年代以来,我们先后在市区、宝鸡、扶风等县的堤防工程建设中,采用混凝土代替砌石护坡的尝试,通过几年的实践观察和洪水考验,这种办法还是可行的,具体方法有:
Baoji City, Weihe River, every year new, about 8 km embankment reconstruction, combined with dike maintenance, conservation, annual stone consumption of about more than 60,000 meters ~ 3, in fact, not only the specifications of local stone can not be guaranteed, but also difficult to complete the number of . In order to solve the problem of insufficient stone source, since the 1980s, we have tried concrete instead of masonry slope protection in the construction of embankments in the urban areas, Baoji, Fufeng and other counties. After several years of practice observation and flood test, The approach is still feasible, the specific methods are: