论文部分内容阅读
本文介绍了湖南水电概况、发展过程及今后展望。论述按综合利用原则规划 ,水资源开发带来的效益 ,及在 1 998年特大洪水发生后取得的成绩。说明水资源开发应加快步伐。湖南水电已初具规模 ,不仅为省网提供了大量电力 ,也为防洪、治水、减灾和经济发展作出了贡献 ,今后要健全防洪系统 ,兴建必要的水库 ,发展水电。
This article introduces the general situation, development process and future outlook of Hunan hydropower. It discusses planning according to the principle of comprehensive utilization, the benefits brought about by the development of water resources, and the results achieved after the catastrophic flood in 1998. Explain that water resources development should speed up the pace. Hunan’s hydropower has begun to take shape. It has not only provided a large amount of electricity for the provincial network, but also contributed to flood control, water control, disaster reduction, and economic development. In the future, we must improve the flood control system, build necessary reservoirs, and develop hydropower.